Linking Method - List of Manufacturers, Suppliers, Companies and Products

Linking Method Product List

1~2 item / All 2 items

Displayed results

Construction method connecting a stop water plug and a bypass pipe [SC plug method]

It is possible to completely stop the flow of wastewater in the pipe and continuously drain it by natural flow! A construction method that allows for repairs while maintaining water flow through the pipe in treatment facilities and manholes.

The "SC Plug Method" is a temporary water replacement method for sewer facilities. It allows for repairs while maintaining water flow through the pipes in treatment facilities and manholes, and it creates a completely watertight condition for wastewater, enabling efficient work in a safe and hygienic environment. We have over 400 construction achievements, including sewer treatment plant and manhole repairs! 【Features】 ■ Water-stopping effect ■ No maintenance required ■ Improved work efficiency and work environment ■ Safety and environmental hygiene ■ Possible to transport in sections *For more details, please request materials or view the PDF data available for download.

  • Special Construction Method
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Connection Method

Connecting buildings that were separated! You can make effective use of dead space within the site.

The "Connection Construction Method" involves constructing a new building (or an extension) that aligns with the floor level of two existing buildings that are separated by a gap, thereby integrating (linking) the previously disconnected structures. This method allows for the effective use of dead space within the site, enabling operations to continue without being affected by weather conditions when moving between factories. Furthermore, the creation of new pathways in what were originally separate buildings can lead to improvements in productivity and smoother production lines. 【Features】 ■ Integration (linking) of previously disconnected buildings ■ Effective use of dead space within the site ■ Operations can continue without being affected by weather conditions when moving between factories ■ Potential for improvements in productivity and smoother production lines *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration